Just wondering what the general consensus is on this, me not being
a fab guy.
Should field weld and field-fit welds be indicated on the piping isometric (I'm not referring to spool sheets)?
Since it is the piping fabricator who will be installing the system, aren't they in a better position to determine where to break up the line? I suspect that most effort put into specifying FWs and FFWs is wasted.
Paul Received on Thu Jun 07 19:26:00 2001