RE: Piping Erection

From: <Mark>
Date: Tue Jun 12 2001 - 11:03:00 EDT


I agree to specify FFW's at the design stage gets everyone thinking on the same page,
expecially close to boilers, pumps, etc to avoid some fitter bolting up a flange
and causing alignment problems.

Are fabrication shops producing pipe spools are thing of the past?

Mark

-----Original Message-----
From: Gerardo Delgado [mailto:gdelgado@tecnoconsult.com] Sent: Monday, June 11, 2001 4:01 PM
To: <a href="/group/PipingDesign/post?postID=I19wSWD5E3r4izIMUstPgWWv79U9NzVV4zk6XtrfCrrAH46z64RTZLqZvENUJbSPBLHgBMZ3RMY02oN-dWJHRGND">PipingDesign@yahoogroups.com</a> Subject: Re: [PipingDesign] Piping Erection

I totally agree. It is not a waste of time. Put them on the isos! Gerardo

<a href="/group/PipingDesign/post?postID=ark0mpgu2j967hmhsBWvArbBbMwtFzx2IRo29h69rGPTHHumyIu5eaS3xIdvkECQghzQH7YPWFOTVhr9TXnFZNHY">geoff.stone@lendlease.com.au</a> wrote:

> It depends on the project. I have had cases where the shop fabricator was
a
> differnent organisation to the installation contractor. Off shore work is
> invariably like this. I have normally got an experienced supervisor or
foreman
> to mark up the isos at checking stage for the FFWs. In the contract
documents
> you can always allow the fabricator/field installer to change the FFWs if
they
> are one and the same.
>
> Many contractors do not produce shop spool drawings these days preferring
to
> work directly from the isos. They may not even have a spooling shop rather
> erecting a temporary area at site.
>
> I do not think this level of detail is a waste of time if you use
experienced
> resources to put on the information. Even if the field guy has a different
> opinion to where FFWs go it does not mean they are right or any smarter
than the
> designer.
>
> "Paul Bowers" <pbowers@pipingdesign.com> on 08/06/2001 09:26:26
>
> Please respond to <a href="/group/PipingDesign/post?postID=I19wSWD5E3r4izIMUstPgWWv79U9NzVV4zk6XtrfCrrAH46z64RTZLqZvENUJbSPBLHgBMZ3RMY02oN-dWJHRGND">PipingDesign@yahoogroups.com</a>
>
> To: <PipingDesign@yahoogroups.com>
> cc:
>
> Subject: [PipingDesign] Piping Erection
>
> Just wondering what the general consensus is on this, me not being
> a fab guy.
>
> Should field weld and field-fit welds be indicated on the piping
> isometric (I'm not referring to spool sheets)?
>
> Since it is the piping fabricator who will be installing the
> system, aren't they in a better position to determine where to
> break up the line? I suspect that most effort put into specifying
> FWs and FFWs is wasted.
>
> Paul
>
>
> Yahoo! Groups Sponsor
>
> www.debticated.com
>
> [IMAGE]
>
>
> _____________________
> Piping Design Central
> [ http://www.PipingDesign.com ]
> ________________________________________
> We hope you find this newsletter useful.
> If not, you can unsubscribe at:
> <a href="/group/PipingDesign/post?postID=7sDWPBAcKA0Evgl7yDxxs-cVep19Wx-8qx5M346mTdRhiNX3iyDsyn5aeNlXlp4XTRKeYVKlpf6tuqeYh5nBaAKMUuT9bvJ8bkeF6vHB2tsj">PipingDesign-unsubscribe@yahoogroups.com</a>
> Post message: <a href="/group/PipingDesign/post?postID=I19wSWD5E3r4izIMUstPgWWv79U9NzVV4zk6XtrfCrrAH46z64RTZLqZvENUJbSPBLHgBMZ3RMY02oN-dWJHRGND">PipingDesign@yahoogroups.com</a>
> Subscribe:
> ----------
>
> <a href="/group/PipingDesign/post?postID=WUTblBF3RY_gTEFR6JUeMJcaYhygDADOfMVd9j8g4x2pU_ifbnx7jxP7b8GKjCI8iWRtKW1XV7QS5sCMufKIInTOXDRh500zPY4kOQ">PipingDesign-subscribe@yahoogroups.com</a>
>
> Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.
>
> [Non-text portions of this message have been removed]
>
> _____________________
> Piping Design Central
> [ http://www.PipingDesign.com ]
> ________________________________________
> We hope you find this newsletter useful.
> If not, you can unsubscribe at:
> <a href="/group/PipingDesign/post?postID=7sDWPBAcKA0Evgl7yDxxs-cVep19Wx-8qx5M346mTdRhiNX3iyDsyn5aeNlXlp4XTRKeYVKlpf6tuqeYh5nBaAKMUuT9bvJ8bkeF6vHB2tsj">PipingDesign-unsubscribe@yahoogroups.com</a>
> Post message: <a href="/group/PipingDesign/post?postID=I19wSWD5E3r4izIMUstPgWWv79U9NzVV4zk6XtrfCrrAH46z64RTZLqZvENUJbSPBLHgBMZ3RMY02oN-dWJHRGND">PipingDesign@yahoogroups.com</a>
> Subscribe: <a href="/group/PipingDesign/post?postID=WUTblBF3RY_gTEFR6JUeMJcaYhygDADOfMVd9j8g4x2pU_ifbnx7jxP7b8GKjCI8iWRtKW1XV7QS5sCMufKIInTOXDRh500zPY4kOQ">PipingDesign-subscribe@yahoogroups.com</a>
>
> Your use of Yahoo! Groups is subject to <a href="http://docs.yahoo.com/info/terms/">http://docs.yahoo.com/info/terms/</a>



Piping Design Central
[ http://www.PipingDesign.com ]

We hope you find this newsletter useful. If not, you can unsubscribe at:
<a href="/group/PipingDesign/post?postID=7sDWPBAcKA0Evgl7yDxxs-cVep19Wx-8qx5M346mTdRhiNX3iyDsyn5aeNlXlp4XTRKeYVKlpf6tuqeYh5nBaAKMUuT9bvJ8bkeF6vHB2tsj">PipingDesign-unsubscribe@yahoogroups.com</a> Post message: <a href="/group/PipingDesign/post?postID=I19wSWD5E3r4izIMUstPgWWv79U9NzVV4zk6XtrfCrrAH46z64RTZLqZvENUJbSPBLHgBMZ3RMY02oN-dWJHRGND">PipingDesign@yahoogroups.com</a> Subscribe: <a href="/group/PipingDesign/post?postID=WUTblBF3RY_gTEFR6JUeMJcaYhygDADOfMVd9j8g4x2pU_ifbnx7jxP7b8GKjCI8iWRtKW1XV7QS5sCMufKIInTOXDRh500zPY4kOQ">PipingDesign-subscribe@yahoogroups.com</a>

Your use of Yahoo! Groups is subject to <a href="http://docs.yahoo.com/info/terms/">http://docs.yahoo.com/info/terms/</a> Received on Tue Jun 12 11:03:00 2001

This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:12 EST