members may want to consider the following.
all piping components should be protected to prevent damage during
shipment and storage.
cover flange face with 1/2: thick plywood secured by at least 4 bolts. apply rust preventative compound and cover with PE sheet.
pipe ends to be protected with plastic caps
stencilled each pipe spool with the spool no.
require supplier or fabricator to include in the packing list the mill certificate and other pertinent technical documents. Received on Wed Aug 01 00:54:00 2001
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:14 EST