Rakesh:
could you tell me a bit more about your system? i'm assuming it is a recirculating cooling water system with several exchangers.
>is this new system, or are you restarting an existing system after modifications/repairs?
>is the tower of wood construction? >what is the basin volume? >what is the calcium content of the water used for flushing?
the intent of initial cleaning and passivation is to remove any construction debris from the system and to properly prepare the system for corrosion inhibition.
At 10:24 AM 3/28/2002 +0530, you wrote:
>** High Priority **
>
>Thanks for the information you have provided me for commissioning of
>Cooling Water System. Regarding Flushing, we generally conduct it for the
>cleaning of piping from inside before commissioning the line. Is there any
>specific criteria for Flushing? How do we plan that activity? To flush
>means just to pass clean water through that line till we get same clean
>water from outside - this is the what I know about it. is it the only
>thing required in flushing?
>
>please suggest.
>
>regards,
>rakesh
>
> >>> tlaupa@frii.com 03/23/02 09:27PM >>>
>
>
>
>
>_____________________________________________________
>Unsubscribe: PipingDesign-unsubscribe@yahoogroups.com
>
>Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/
Received on Fri Mar 29 19:16:00 2002
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:23:56 EDT