hi pete. its nice to know someone who previously works for the DoD. Been
with with NavFac and the only mil spec i can still recall is the M-3. i
believe you - sawingoff a couple of threads. we have to knock off a couple
of walls since the number of masonry block doesnt matched with what is shown
on the drawings.
-----Original Message-----
From: Pete Burns [mailto:pete-o@pluto.njcc.com]
Sent: 22 March, 2002 5:35 AM
To: <a href="/group/PipingDesign/post?postID=LLS6czLmnEBLf-UvlI407kCNaWYemI8kgpcVr372uqEiItu8FGT93cRSNDU7JS3UlxR7JrK7vHU2ET1EXF-cR3RUUrm3">PipingDesign@yahoogroups.com</a>
Subject: Re: [PipingDesign] Thread and Bolt Engagement.
While in the Navy a number of years back, I know there was a regulation (NavSea maybe) about bolt thread engagement. It was 3-5 threads showing. I know the military is a little on the cautious side. I remember well because I had fix alot of them. We also had to saw off the extra threads too - to get through our inspections.
Just thought I'd throw in one more comment Pete
Your use of Yahoo! Groups is subject to <a href="http://docs.yahoo.com/info/terms/">http://docs.yahoo.com/info/terms/</a> Received on Fri Mar 22 23:42:00 2002
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:22 EST