> if you take a look at the arrangement for the sleeper, it s
nothing more
> than a slab of concrete with a steel base at the the top. Again,
the normal
> arrangement is to run your offsite pipeline at grade level with
the pipe
> resting on the top of the steel base ( with or without the
shoe).
I recall a refinery old-timer telling me once that they are called "sleepers" because they mostly sleep underground.
Paul Received on Sat May 04 22:02:00 2002
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:23:56 EDT