> Hi friends,
> Rejoined the group under the new email ID. I have shifted to offshore
group. Just had a doubt on stress analysis of high pressure piping of well
heads connecting to production manifolds. Do we need to consider any
bourdon effects. Secondly do we have to check allowables with choke valve
vendor. Is that a regular practice. Thirdly during load out of deck, there
is a practice of clamping most of the lines. Is this supporting criteria
considered in stress analysis.
> Expect favorable reply from experienced offshore guys.