As per Caeser manual for checking of hot sustained stresses only T1 case to prepared & to substracted from operating case at temp. T1 i.e. W+T1+P1. The other method to check hot sustained stress is to off /delete the support at the point of location of lift & check the stresses in sustained case as generated by Caeser by default. Which method is correct??is there any difference in these two methods ??Any Suggestions??
Regards,
Raj..
Received on Mon Aug 26 05:13:00 2002
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:23:58 EDT