- What are the basic reasons for PSV outlet lines are connected to the flare
header at 45 deg(in the flow direction. 2. During stress analysis which one is
preferable :- to consider the branch lines along with the main flare header
analysis ( the flare line --header is subjected to undergo seismic analysis as
per bid requirement) or to consider the flare header a unique package and the
connected lines in individual stress systems. The displacements of the connected
nodes of the flare system to be included in connected lines or To analyse the
systems seperately and use the include file option for achieving the combined
effect of the branches on header vis a vis. Dipesh Das
Do you Yahoo!?
The New Yahoo! Search - Faster. Easier. Bingo.
[Non-text portions of this message have been removed]
Received on Tue Apr 29 03:58:00 2003