BEP

From: <hankl46>
Date: Tue Jun 17 2003 - 19:12:00 EDT

To facilitate for shipment, a mechanically assembled boiler external piping was disassembled from the boiler after the hydrostatic test was completed and the authorized inspector signed the Master Data Report. Does Section 1 require completion of Form P-4B when the BEP is reinstalled in the field? Received on Tue Jun 17 19:12:00 2003