The amount varies per customer spec, but it is usually approx. 2"
required space between 2 parallel runs of pipe for wipe-down. More
would usually be factored in if it weren't for the tight spaces we have
to fit everything into.
Regards,
Aaron Wolfe
Piping Designer
Paul Mueller Company
P.O. Box 828
Springfield, Mo 65801
(417) 575-9780
E-mail: <a href="/group/PipingDesign/post?postID=hyzzSDh8srd7lUzBS638O8_lOmgOVZFOPNUNwuIOxchNIsPKrcgF2yPmRB9sAhafKjZCgIbTKnXt">awolfe@muel.com</a>
-----Original Message-----
From: Paul Bowers [mailto:pbowers@pipingdesign.com]
Sent: Thursday, October 30, 2003 8:56 AM
To: <a href="/group/PipingDesign/post?postID=hgyENQoRO8I33U5LtgFSMh0WruNDEs4TOyJx7H0mAWAH5TTwVePXo1DEu2sXADkBx-wW6EVmCzDya5JB5ZPNk7ep">PipingDesign@yahoogroups.com</a>
Subject: Re: [PipingDesign] Straight runs for flowmeters
Hmmm, maybe cryogenic piping would fit in that group as well (although
the
extremely low temperatures would sort of set it apart). When you mention
clearances, what does that mean?
Paul
> Ok I see what you mean. I say, yes. They all work in similar
materials,
> similar instruments, and similar environments. One of the hardest
> things that I've seen for designers working for the first time with
> Pharm/food/semicon industry are the slopes and clearances that have to
> be maintained for a system to be certified. And the cleanliness
issues
> that have to be maintained when the system you're designing is going
in
> a clean room. Some of the contract pipers we've hired just don't get
> it. Why does this line need to slope 1/4" per foot? Why do they need
> that much room to clean between pipe runs? Etc, etc.
>
> Regards,
>
> Aaron Wolfe
> Piping Designer
> Paul Mueller Company
> P.O. Box 828
> Springfield, Mo 65801
> (417) 575-9780
> E-mail: <a href="/group/PipingDesign/post?postID=hyzzSDh8srd7lUzBS638O8_lOmgOVZFOPNUNwuIOxchNIsPKrcgF2yPmRB9sAhafKjZCgIbTKnXt">awolfe@muel.com</a>
>
>
> -----Original Message-----
> From: Paul Bowers [mailto:pbowers@pipingdesign.com]
> Sent: Thursday, October 30, 2003 8:37 AM
> To: <a href="/group/PipingDesign/post?postID=hgyENQoRO8I33U5LtgFSMh0WruNDEs4TOyJx7H0mAWAH5TTwVePXo1DEu2sXADkBx-wW6EVmCzDya5JB5ZPNk7ep">PipingDesign@yahoogroups.com</a>
> Subject: Re: [PipingDesign] Straight runs for flowmeters
>
> As a subgroup of the piping design "discipline", I mean. I.E., those
> who
> have experience in one of these 3 fields wouldn't take long to get up
to
> full speed if moved to one of the others.
>
> Paul
>
> ----- Original Message -----
> From: "Aaron Wolfe" <awolfe@muel.com>
> To: <PipingDesign@yahoogroups.com>
> Sent: Thursday, October 30, 2003 9:27 AM
> Subject: RE: [PipingDesign] Straight runs for flowmeters
>
>
> > Grouped together as to what? Discussions? Or just the type of work?
> I
> > guess I'm just not sure what you mean.
> >
> > Regards,
> >
> > Aaron Wolfe
> > Piping Designer
> > Paul Mueller Company
> > P.O. Box 828
> > Springfield, Mo 65801
> > (417) 575-9780
> > E-mail: <a href="/group/PipingDesign/post?postID=hyzzSDh8srd7lUzBS638O8_lOmgOVZFOPNUNwuIOxchNIsPKrcgF2yPmRB9sAhafKjZCgIbTKnXt">awolfe@muel.com</a>
> >
> >
> > -----Original Message-----
> > From: Paul Bowers [mailto:pbowers@pipingdesign.com]
> > Sent: Thursday, October 30, 2003 8:25 AM
> > To: <a href="/group/PipingDesign/post?postID=hgyENQoRO8I33U5LtgFSMh0WruNDEs4TOyJx7H0mAWAH5TTwVePXo1DEu2sXADkBx-wW6EVmCzDya5JB5ZPNk7ep">PipingDesign@yahoogroups.com</a>
> > Subject: Re: [PipingDesign] Straight runs for flowmeters
> >
> > Question for you: should the pharmaceutical, food and semiconductor
> > industries (related to piping) be grouped together? All require
> extreme
> > cleanliness, use SS and typically smaller bore piping is used.
> >
> > Paul
> >
> >
> > ----- Original Message -----
> > From: "Aaron Wolfe" <awolfe@muel.com>
> > To: <PipingDesign@yahoogroups.com>
> > Sent: Thursday, October 30, 2003 8:50 AM
> > Subject: RE: [PipingDesign] Straight runs for flowmeters
> >
> >
> > > I work in pharmaceutical piping mostly. The Flow meters that I've
> > used
> > > have a requirement for 3-6 OD's length of pipe upstream of the
> > > instrument. What this does is get a more laminar flow out of the
> > > product which provides better accuracy in measurement.
> > >
> > > Regards,
> > >
> > > Aaron Wolfe
> > > Piping Designer
> > > Paul Mueller Company
> > > P.O. Box 828
> > > Springfield, Mo 65801
> > > (417) 575-9780
> > > E-mail: <a href="/group/PipingDesign/post?postID=hyzzSDh8srd7lUzBS638O8_lOmgOVZFOPNUNwuIOxchNIsPKrcgF2yPmRB9sAhafKjZCgIbTKnXt">awolfe@muel.com</a>
Your use of Yahoo! Groups is subject to
<a href="http://docs.yahoo.com/info/terms/">http://docs.yahoo.com/info/terms/</a>
Received on Thu Oct 30 10:02:00 2003
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:30 EST