Has anybody any experience of WAG (Water alternating gas) injection well
piping ?
This is the first time we are doing engineering of this type of well and it
is the first time the client is using this technology.
I would be interested to know the type of constraints, problems encountered (experienced) so that atmost care can be taken while doing the piping, stress, supporting etc. of this piping.
Have a nice day.
-Mandar.
This message comes from Mandar's desk.
This e-mail and any files transmitted with it (ë Message û) are confidential
and may contain privileged information.
This Message is intended solely for the addressee(s). If you have received this
Message in error, please inform us promptly by reply e-mail then delete the
Message and destroy any printed copy of it.
Any unauthorized use, review, retransmission, dissemination, distribution,
printing or copying of this Message or any part thereof is strictly prohibited.
E-mails are susceptible to alteration. Neither Technip nor any of its
subsidiaries and affiliates shall be liable for the Message if altered, changed
or falsified
[Non-text portions of this message have been removed] Received on Wed Feb 18 01:40:00 2004
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:02 EDT