They probably need mechanical joints for periodic clean-out/inspection.
Just a guess, since we don't know what the process fluid is.
Paul
From: "Michael Waugh
> in a drawing. However, question I ask is why not weld all the pipe if
> possible? Use a short leg or place a reducer with heavy duty clamps.
On a