Re: Cost Estimation

From: <Paul>
Date: Sat Oct 09 2004 - 19:28:00 EDT


Bingo. This is still true even though we now have amazingly powerful "thinking machines" to help us.

I hope to start a good-natured argument with the comments below, so take everything I say in that light.

The PFD (which most people never even see) leads to the P&ID with all the nice lines and logical layout. Unfortunately, then the real world interrupts.

If we work backwards from a well-installed, properly-functioning process piping facility, we get to the drawings from which it was built.

Engineers typically do not understand that one hours' work (calculation, analysis perhaps) on their part can easily mean 10 hours work for the person that is creating the model/drawing.

What I have found with many engineers (me having over 20 years of experience) is that they don't really know what they want until they see it. They seem to be able to visualize *their* ideas but cannot appreciate the time it really takes to make the drawings.

Engineers that typically work on smaller jobs are especially bad in this regard. What they really need/want is a plumber that can draw pictures for the client presentation, not a piping designer.

Paul

Steve McKenzie wrote:

> Right on
>
> piping has a history of having the largest cost overrun on projects,
> even when professionally estimated and locked into fixed (ha ha) price
> contracts. For some guidelines, look at John S Page's books published by
> Gulf, but tread warily.
>
> Cheers
>
> Steve
>
> -----Original Message-----
> From: Al [mailto:alwynk@shaw.ca]
> Sent: Friday, October 08, 2004 4:53 AM
> To: <a href="/group/PipingDesign/post?postID=3FDG-dyzN6UxDM3tXAx0NWsWa5_t5S614CZCQ_En-Vb_iJ3BhXA8dDLZ09FtdFe0pY4FoaVG_hrfK2HyGA1o452jXQ">PipingDesign@yahoogroups.com</a>
> Subject: RE: [PipingDesign] Cost Estimation
>
>
>
> dear amit,
> trust us on this one
> thats exactly why estimators have gainful full time employment. if it
> was as easy as you ask, they would have no job. would you hand over all
> the knowledge of your job so you could become unemployed? besides you
> have to seriously question the value and accuracy of data given to you
> in the way you ask. Estimating is a serious skill and many serious
> decisions are based upon it. If you are trying to cut so many corners
> what value is the attempt you are making going to have. Theres no harm
> in building your own knowledge base of costing, but dont pretend its any
> more than that when you are starting from scratch. For one thing it
> changes constantly and only a professional estimator is up with the play
> In the long run you will save money by letting a skilled estimator do
> it. this is from experience, Paul knows our recent case. I've seen many
> botched estimates and they just cause grief.
>
> ** <a href="/group/PipingDesign/post?postID=mCaD83icg5fVQA0cMaFWvyio7NLcEOsm41fhUH_otkFms5aLg7IGtnGinZgRno-TCk10-3qmpiE-">Altecheng@shaw.ca</a>
>
> ' 001(780)465-9762
> 6 Fax/Msg(780)465-9762
>
> * .
>
> This E-mail (Electronic Mail), its content and any files transmitted
> with it are intended solely for the addressee(s) and may be legally
> privileged and/or confidential. If you are not the intended recipient,
> please delete and contact the sender. It must not be disclosed to any
> person without our authority. If you are not the intended recipient, or
> a person responsible for delivering it to the intended recipient, you
> are not authorized to and must not disclose, copy, distribute, or retain
> this message or any part of it. Sender does not accept responsibility
> for changes made to this E-mail after it was sent.
>
>
>
> -----Original Message-----
> From: anant panchal [mailto:panchal_ak@yahoo.com]
> Sent: Wednesday, October 06, 2004 3:46 AM
> To: <a href="/group/PipingDesign/post?postID=2IosZfIlSAD0jXqXj5lgu-Wg6RCu2oJ-GrCy53mewz1csBprG886ALcjhzTbCkFTnV6M3x_3fDYdUEbxCEbYZmJ_">pipingdesign@yahoogroups.com</a>
> Subject: [PipingDesign] Cost Estimation
>
>
>
>
> Hello all,
> I am getting problems in calculating cost for Pipes,
> Pipe fittings, flanges valves etcs.. I dont have data
> of rates for many items ..As sending querries to
> related manufacturing companies for many different
> components with diff materials is very tedious and
> reply are also not so quick. Can anybody put some
> light for getting tentative rates from any internet
> sites or some other source so that the estimation
> process could be fast
> Regards,