Re: Dimensioned Isometrics

From: <C.Y>
Date: Thu Apr 14 2005 - 21:15:00 EDT

If a change on iso is needed then a FCN (field change notice) will be sent back to our office along with a marked ISO (red line drawing), then we'll rev-up the iso and update the model.

Paul Bowers <pbowers@pipingdesign.com> wrote: C.Y L wrote:

> In my company (EPC), piping GAs are not required, iso and 3d model are the
only deliverables. They will install the piping simply by using the iso and the 3d model.

How are the inevitable design changes (during erection) tracked? Does the construction crew have their own 3D model that they can mark-up/modify according to field changes?

As-builts seem to be gaining importance with the whole plant life cycle solution.

Paul



PipingOffice - Excel Spreadsheets for Piping Calculations http://www.pipingoffice.us/

Main site: http://www.pipingdesign.com

Yahoo! Groups Links



Do you Yahoo!?
  Yahoo! Small Business - Try our new resources site!

[Non-text portions of this message have been removed] Received on Thu Apr 14 21:15:00 2005

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:07 EDT