Re: PDMS - Competence Questions

From: <Amit>
Date: Fri May 20 2005 - 03:44:00 EDT

Steve
I have been handling the PDS administration ......both the PDS and PDMS are powerful tools for Plant designing from the grassroot levels....these systems can reduce the total engineering time drasticaly....and provide u all the information that u need at the click of button.....u can have clash checks....u can conduct design reviews and prepare drawings quickely etc
But a cation ::: PDS is a very costly software.....also the person handling this should be very competent and should have hands on experince with the Database as well as of the project execution systems ....to extract the real power of the system
my experience has beeen that PDS is much more powerful system as compered to PDMS because of the beautiful oracle database upon which it is based the reports and interfaces that can be made using it are very useful.. though PDMS is cheap as compared to PDS
Amit

[Non-text portions of this message have been removed] Received on Fri May 20 03:44:00 2005

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:07 EDT