There is another equipment but with less capaciy and it has not
presented the problem. Is there a posibility in replace the ASTM A-193
GR B7 stud with a Machine Bolt Grade 8?
- In PipingDesign@yahoogroups.com, Christopher Wright <chrisw@s...>
wrote:
>
> On May 17, 2005, at 10:46 AM, alejandroperezposada wrote:
>
> > We think that the problem probably is due to the variation cyclic of
> > temperature.
> Is there anything unconventional about the joint? do you have any
> similar equipment or different equipment subject to the same
> temperature cycling?
> Christopher Wright P.E. |"They couldn't hit an elephant at
> chrisw@s... | this distance" (last words of Gen.
> .......................................| John Sedgwick, Spotsylvania
> 1864)
> <a href="http://www.skypoint.com/~chrisw/">http://www.skypoint.com/~chrisw/</a>
Received on Tue May 17 12:56:00 2005