I would like to know if it is mandatory to replace
> all gaskets after pressure test of piping. If we do
> replace the same how do we ensure proper flange
> tightening? I believe one of the major role of
> pressure testing of pipes is to ensure proper bolt
> tightening and leak proof flange joint.
>
> Pankaj Mandal.
345.1 of ASME B31.3-2002 reads in part "... each piping system shall be tested to ensure tightness." I guess the satement refers not only to flange joint of the pipe. Received on Tue Sep 06 03:49:00 2005
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:09 EDT