Pipe was hydro and leak was noted. Does that mean that the fix could be anything other than welding after the PWHT was carried out? Let us further assumed that the leak was observed at the weld joint and the line is new. Received on Tue Sep 13 03:23:00 2005
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:09 EDT