>Ladies and Gents:
Have been asked to stamp the design of a potable water system. this is outside my area of expertise, so i have declined.
however, it got me thinking. who regulates potable water systems and what criteria are considered in their design?
>
Thomas G Laupa PE
Senior Engineer
Office Address: 1601 Diehl Road, Naperville, IL, 60563
Courier Address: 1003 Remington, Fort Collins, CO, 80524
970-227-5127
800-493-5009 fax
Received on Fri Sep 23 15:21:00 2005
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:09 EDT