Hi John
Yes the accelerations are a little on the high side.
I suspect, as Chris indicates, that there has been some "to be sure, to
be sure" going on, because most likely the application will be critical
service.
However in this instance I can see no harm in overdesign, and it may
cost less overall than talking the client around to a rational design
basis.
Cheers
Steve
-----Original Message-----
From: PipingDesign@yahoogroups.com [mailto:PipingDesign@yahoogroups.com]
On Behalf Of John Luf
Sent: Tuesday, October 04, 2005 2:45 PM
To: PipingDesign@yahoogroups.com
Subject: Re: [PipingDesign] Seismic response of hydraulic oil tank
Is it possible that you meant 0.10G & 0.50G? Iv'e designed plant piping all over the globe and have never been handed a ground acceleartion of this magnitude...
If this is the correct ground level accelartion please advise where it is because I want to make sure I never visit the area.
> The nominated ground acceleration is 10g if the
> natural frequency is
> within 0.15-0.2 seconds; otherwise 5g. Maximum
> ground displacement is
> given as 60mm, all directions.
Yahoo! Groups Links Received on Tue Oct 04 00:47:00 2005