Agreed. But even PDMS donot have a bulletproof system that will communicate/link its data seamlessly with other big time apps used in Process Safety/Engineering/Production/Maintenance such as those from Berwanger, SAP or Meridium to name a few. The data migration process is still tedious and time consuming â download, convert and used. And if the format is different (as it normally happens) then man you can just forget about it and youre back to the stone age â manual input and data redundancy.
Before give me a Tsquare, slide rule and a drafting board, will travel. Now, even this is no longer possible. Ah, technology - its driving you nuts.
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:10 EDT