Hi Mahdi
As far as i understandand that tank settlement will change in vertical distance (in case of nozzle located at elevated position) or vertical clearance in grade level piping. In both cases you can handle this situation by providing screw type adjustable support. In this support you can adjust the TOS (top of support) as per BOP results in settlement of the tank.
Cheers
A. Aziz Vayani
Sr. Facilities Design Engineer
Clough ----- Pakistan Operations
Hi all
In the LAVAN LPG project we have some LPG tanks. After hydro test
according to soil reports we have 1 to 2.5 cm settlement and time of
this test is 3 months. So according to project conditions we have we
don't have enough time. And we have to change the piping routes. So
here I need to help.
What can I do?
We want to not buy expansion joint or loose flange can we use CAN
support (negative springs) or not?
If we have to use expansion joint do we have special standard about
this one or not?
Please help me.
Thanks advanced.
Mahdi.N.R
________________________________________________________________________________\
[Non-text portions of this message have been removed] Received on Mon Apr 02 02:02:00 2007
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:50 EST