Re: Amount of piping

From: <Manoj>
Date: Mon Apr 02 2007 - 01:57:00 EDT


thanx arturo,

but my questions is can the plant with this capacity (4380 tonns/day) will have 2500 lines or more ? i don't have the p&id's so i really can't count the lines.

Regards,
Manoj

Arturo Murillo wrote:
>
> Manoj.
>
> (Lines are meters? ) I may be off, but that is a very wild guess.
>
> Go with the following:
>
> Pipe Cost for a fluid process plant is:
>
> As of percent of purchases-equipment: 36% Material, 30% Labor, (66%
> Total) .
>
> Ref: Plant Design and Economics for Chemical Engineers, by Max S. Peters.
>
> Good luck,
>
> Arturo Murillo
> Tuberias Visa
> México.
>
> ----- Original Message -----
> From: Manoj Varma
> To: <a href="/group/PipingDesign/post?postID=at-zfvyhP3lZqUQSie8mMl9IXzX-T4L0jD0w5D0vvhgxvjEi9wQXcpzrG9lDqSqYtQzfgnaB8hH4GjMO2TADlfux9Tg4">PipingDesign@yahoogroups.com</a> <mailto:PipingDesign%40yahoogroups.com>
> Sent: Saturday, March 31, 2007 9:28 AM
> Subject: [PipingDesign] Amount of piping
>
> hi,
>
> in phophoric acid plant made by wet process (hemidydrate)
>
> capacity : 4380 tonns/day
>
> can any body please tell about how many pipe lines will involve.
>
> i have some rough estimate is about 2500 lines is this correct.
>
> this plant have 900 equipments
>
> regards,
> Manoj
>
> [Non-text portions of this message have been removed]
>
>

[Non-text portions of this message have been removed] Received on Mon Apr 02 01:57:00 2007

This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:50 EST