9000 equipments.
Can be a combination of mechanical, electrical and instrumentation
equipment (in our plant, a "piping" qualifies as an equipment too
and so does hoses and other safety devices - but that is another
issue).
Removing I&E leave us with mech equipment that has both an inlet and
outlet piping. Pumps, compressor and other similar equipment has in
most cases only have a discharge and suction. Columns, pressure
vessel, storage tanks and similar other equipment have multiple
inlet/outlet nozzle.
From here (and mind you, this is only an estimate) its pretty easy
to work out the math to figure out (in order of magnitude est)the
answer to your question related to the number of lines installed
(assuming its already built).
- In PipingDesign@yahoogroups.com, bbullough@... wrote:
>
> Manoj:
>
> Please define "line". I may be missing something, but I can
imagine
> multiple definitions. A line could be the route between a tank
and a
> reactor, including pump and installed backup pump, flowmeters,
control
> valves, manual bypasses around the control valves, etc. Or it
could be
> the pipes between each of the above. If the latter is used as the
> definition, 2500 is rather easy to have. If the former, it must
be a very
> complex process!
>
> ... Bruce D. Bullough ...
> Lead Process Engineer
> Foth Production Systems, LLC
> 8550 Hudson Boulevard North, Suite 100
> Lake Elmo, MN 55042
> Direct: +651-288-8598 Fax: +651-288-8551
> <a href="http://www.foth.com">http://www.foth.com</a>
>
>
> IMPORTANT NOTICE
> This communication including any attachments, (E-mail) is
confidential and
> may be proprietary, privileged or otherwise protected from
disclosure. If
> you are not the intended recipient, please notify the sender,
permanently
> delete this E-mail from your system and destroy any copies. Any
use of
> the E-mail, including disclosure, distribution or replication, by
someone
> other than its intended recipient is prohibited.
>
> This E-mail has the potential to have been altered or corrupted
due to
> transmission or conversion. It may not be appropriate to rely
upon this
> E-mail in the same manner as hard copy materials bearing the
author's
> original signature or seal.
>
>
>
>
> Manoj Varma <manoj.varma@...>
> Sent by: <a href="/group/PipingDesign/post?postID=RTgDoXPmIN8b9RPzOiUaRlrOzntvMNIRRhaBh4RcLMxqRkMX1jTrtroIwvhZAfpA33XLzM_BEKMPJuW1fQHj5naw-uJRLNY">PipingDesign@yahoogroups.com</a>
> 04/02/2007 12:57 AM
> Please respond to
> <a href="/group/PipingDesign/post?postID=RTgDoXPmIN8b9RPzOiUaRlrOzntvMNIRRhaBh4RcLMxqRkMX1jTrtroIwvhZAfpA33XLzM_BEKMPJuW1fQHj5naw-uJRLNY">PipingDesign@yahoogroups.com</a>
>
>
> To
> <a href="/group/PipingDesign/post?postID=RTgDoXPmIN8b9RPzOiUaRlrOzntvMNIRRhaBh4RcLMxqRkMX1jTrtroIwvhZAfpA33XLzM_BEKMPJuW1fQHj5naw-uJRLNY">PipingDesign@yahoogroups.com</a>
> cc
>
> Subject
> Re: [PipingDesign] Amount of piping
>
>
>
>
>
>
> thanx arturo,
>
> but my questions is can the plant with this capacity (4380
tonns/day)
> will have 2500 lines or more ? i don't have the p&id's so i really
can't
> count the lines.
>
> Regards,
> Manoj
>
> Arturo Murillo wrote:
> >
> > Manoj.
> >
> > (Lines are meters? ) I may be off, but that is a very wild guess.
> >
> > Go with the following:
> >
> > Pipe Cost for a fluid process plant is:
> >
> > As of percent of purchases-equipment: 36% Material, 30% Labor,
(66%
> > Total) .
> >
> > Ref: Plant Design and Economics for Chemical Engineers, by Max
S.
> Peters.
> >
> > Good luck,
> >
> > Arturo Murillo
> > Tuberias Visa
> > México.
> >
> > ----- Original Message -----
> > From: Manoj Varma
> > To: <a href="/group/PipingDesign/post?postID=RTgDoXPmIN8b9RPzOiUaRlrOzntvMNIRRhaBh4RcLMxqRkMX1jTrtroIwvhZAfpA33XLzM_BEKMPJuW1fQHj5naw-uJRLNY">PipingDesign@yahoogroups.com</a> <mailto:PipingDesign%
40yahoogroups.com>
> > Sent: Saturday, March 31, 2007 9:28 AM
> > Subject: [PipingDesign] Amount of piping
> >
> > hi,
> >
> > in phophoric acid plant made by wet process (hemidydrate)
> >
> > capacity : 4380 tonns/day
> >
> > can any body please tell about how many pipe lines will involve.
> >
> > i have some rough estimate is about 2500 lines is this correct.
> >
> > this plant have 900 equipments
> >
> > regards,
> > Manoj
> >
>
Received on Tue Apr 03 07:18:00 2007