Hi,
In my opinion ......
Foundation settlement can be of two types
1. Short Duration : Generally at the time of Hydro
test . This can be significant.
2. Long Duration : Happens during operation .
Generally piping system is designed for Long duration
settlement. The supporting of piping can be any of the
following
1. Support from the tank foundation. 2. Use of spring 3. Use of flexible element.
Regards
Ashish
> >
> >
> > ----- Original Message ----
> > From: mahdi_amb <mahdi_amb@yahoo.com>
> > To: <a href="/group/PipingDesign/post?postID=UJbdRVdtDUYgPE0Vf20dWWqMcg6yR9-o7T2AByUuB8QY7A2ISaXd_U-C50VEnn1qs767wSKxGBp9cfJgwLWttj6oyTOekMQ">PipingDesign@yahoogroups.com</a>
> > Sent: Sunday, April 1, 2007 7:18:10 PM
> > Subject: [PipingDesign] settlement
> >
> > Hi all
> > In the LAVAN LPG project we have some LPG tanks.
> > After hydro test
> > according to soil reports we have 1 to 2.5 cm
> > settlement and time of
> > this test is 3 months. So according to project
> > conditions we have we
> > don't have enough time. And we have to change the
> > piping routes. So
> > here I need to help.
> > What can I do?
> > We want to not buy expansion joint or loose flange
> > can we use CAN
> > support (negative springs) or not?
> > If we have to use expansion joint do we have
> special
> > standard about
> > this one or not?
> >
> > Please help me.
> > Thanks advanced.
> > Mahdi.N.R
> >
> >
> >
> >
> >
> >
> >
> >
>
________________________________________________________________________________\
________________________________________________________________________________\
________________________________________________________________________________\
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:50 EST