Manoj:
Please define "line". I may be missing something, but I can imagine multiple definitions. A line could be the route between a tank and a reactor, including pump and installed backup pump, flowmeters, control valves, manual bypasses around the control valves, etc. Or it could be the pipes between each of the above. If the latter is used as the definition, 2500 is rather easy to have. If the former, it must be a very complex process!
... Bruce D. Bullough ...
Lead Process Engineer
Foth Production Systems, LLC
8550 Hudson Boulevard North, Suite 100
Lake Elmo, MN 55042
Direct: +651-288-8598 Fax: +651-288-8551
http://www.foth.com
IMPORTANT NOTICE
This communication including any attachments, (E-mail) is confidential and
may be proprietary, privileged or otherwise protected from disclosure. If
you are not the intended recipient, please notify the sender, permanently
delete this E-mail from your system and destroy any copies. Any use of
the E-mail, including disclosure, distribution or replication, by someone
other than its intended recipient is prohibited.
This E-mail has the potential to have been altered or corrupted due to transmission or conversion. It may not be appropriate to rely upon this E-mail in the same manner as hard copy materials bearing the author's original signature or seal.
Manoj Varma <manoj.varma@rolta.com>
Sent by: PipingDesign@yahoogroups.com
04/02/2007 12:57 AM
Please respond to
PipingDesign@yahoogroups.com
To
PipingDesign@yahoogroups.com
cc
Subject
Re: [PipingDesign] Amount of piping
thanx arturo,
but my questions is can the plant with this capacity (4380 tonns/day) will have 2500 lines or more ? i don't have the p&id's so i really can't count the lines.
Regards,
Manoj
Arturo Murillo wrote:
>
> Manoj.
>
> (Lines are meters? ) I may be off, but that is a very wild guess.
>
> Go with the following:
>
> Pipe Cost for a fluid process plant is:
>
> As of percent of purchases-equipment: 36% Material, 30% Labor, (66%
> Total) .
>
> Ref: Plant Design and Economics for Chemical Engineers, by Max S.
Peters.
>
> Good luck,
>
> Arturo Murillo
> Tuberias Visa
> México.
>
> ----- Original Message -----
> From: Manoj Varma
> To: PipingDesign@yahoogroups.com <mailto:PipingDesign%40yahoogroups.com>
> Sent: Saturday, March 31, 2007 9:28 AM
> Subject: [PipingDesign] Amount of piping
>
> hi,
>
> in phophoric acid plant made by wet process (hemidydrate)
>
> capacity : 4380 tonns/day
>
> can any body please tell about how many pipe lines will involve.
>
> i have some rough estimate is about 2500 lines is this correct.
>
> this plant have 900 equipments
>
> regards,
> Manoj
>
Received on Mon Apr 02 09:16:00 2007