Yes, plenty of problems.
-----Original Message-----
From: <a href="/group/PipingDesign/post?postID=jG6nwcSyC9I0G4FdCeoPV7naRHpKrKacgcQI8xxgijWkaTfPf4Qf8W0MXjH4IsIQobsqnahCFP8ymhiMeB7ARP-h">PipingDesign@yahoogroups.com</a> [mailto:<a href="/group/PipingDesign/post?postID=jG6nwcSyC9I0G4FdCeoPV7naRHpKrKacgcQI8xxgijWkaTfPf4Qf8W0MXjH4IsIQobsqnahCFP8ymhiMeB7ARP-h">PipingDesign@yahoogroups.com</a>]
Sent: Saturday, July 21, 2007 1:22 PM
To: <a href="/group/PipingDesign/post?postID=jG6nwcSyC9I0G4FdCeoPV7naRHpKrKacgcQI8xxgijWkaTfPf4Qf8W0MXjH4IsIQobsqnahCFP8ymhiMeB7ARP-h">PipingDesign@yahoogroups.com</a>
Subject: Re: [PipingDesign] Vapor should be in Shell side or tube side....
Hallo gais,
I have problem during field erection, any body can help me.
The problem is the 90 degree elbow seam welding and the long seam welding of the pipe is coming in the same line. is their any problem if i can welding. It is the critical joints, Tie in joints.
With REGARDS
> Dear Friends,
> Please send me the list of Errors in ISO extraction
> in PDS.
>
> Thanks
>
> Dileep
>
>
> [Non-text portions of this message have been
> removed]
>
>
Once upon a time there was 1 GB storage in your inbox. To know the happy ending go to <a href="http://help.">http://help.</a> <http://help.yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html> yahoo.com/l/in/yahoo/mail/yahoomail/tools/tools-08.html
[Non-text portions of this message have been removed] Received on Mon Jul 23 04:24:00 2007
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:51 EST