Re: Piping stress analysis of Vertical reboiler

From: <Christopher>
Date: Sat Aug 18 2007 - 13:55:00 EDT

On Aug 18, 2007, at 12:24 AM, HITESH N PRAJAPATI wrote:

> I have already used higher spring rate to minimise the difference in
> vertical movement of reboiler during operating and empty condition.
I'm going to stick my neck way out here, but this really seems like the place for a couple of expansion joints to isolate the pipe and the reboiler.

Christopher Wright P.E. |"They couldn't hit an elephant at chrisw@skypoint.com | this distance" (last words of Gen.

.......................................| John Sedgwick, Spotsylvania
1864)
http://www.skypoint.com/~chrisw/ Received on Sat Aug 18 13:55:00 2007

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:13 EDT