Gents we are about to commission C4+ (hydrocarbon) pipeline. This
line is protected by ICCP. The commissioning procedure says that we
have to either switch off or disconnect ICCP (impressed current
cathodic protection) before commissioning. After the line is
commissioned we again switch on the ICCP system.
Different people have different views on this. Some say that it is mandatory and some say they never heard of this and it is not required at all. What the group says about this?
Regards
A J
Lead Design Engineer
DES/Technical Dept
........best is NOT good enough! (aj) Received on Tue Feb 12 00:36:00 2008