ICCP of the Hydrocarbon Line

From: <Arif>
Date: Tue Feb 12 2008 - 00:36:00 EST

Gents we are about to commission C4+ (hydrocarbon) pipeline. This line is protected by ICCP. The commissioning procedure says that we have to either switch off or disconnect ICCP (impressed current cathodic protection) before commissioning. After the line is commissioned we again switch on the ICCP system.

Different people have different views on this. Some say that it is mandatory and some say they never heard of this and it is not required at all. What the group says about this?

Regards

A J

Lead Design Engineer

DES/Technical Dept

........best is NOT good enough! (aj) Received on Tue Feb 12 00:36:00 2008

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:15 EDT