Hi,
We are involved in the engineering of offshore piping.
Presently working for a wellhead platform. I have a
doubt on tow acceleration of piping. I understand
this has got to do with the movement of piping while
carrying deck for loadout operation. I would like to
know how to anlyse the piping system on Caesar-II
software for loadout case. Do we need to calculate
acceleration factor and feed it as uniform load. Can
anyone explain in detail
Regards
This archive was generated by hypermail 2.1.8 : Tue Mar 09 2010 - 00:20:33 EST