Re: Feild Check List

From: <tomcruz55>
Date: Sat Mar 29 2003 - 04:51:00 EST

The used of P&ID is very limited udring the mechncal completion. The blinding of the piping system can best be plan using the PI&D - to generate the blind list and ensure that such blinds are removed after the test - but not as part of the punch list. Basically one would rely with iso's, insulation sched and pipe support drawing issued for construction to ensure the the system as erected comply with the spec and costruction drawing.

Received on Sat Mar 29 04:51:00 2003

This archive was generated by hypermail 2.1.8 : Tue Mar 09 2010 - 00:20:41 EST