  1. Generally the block valve, choke valve, chemical injection points and instruments are located near the well head. Our client has asked us to shift everything away from the well and near manifold (50m away) except the spectacle blind and the chemical injection point.
  2. Generally the piping from pig traps goes underground (onshore ) immidiately after the valves , barred tee and insulating joint and is anchored below ground. Our partner has asked us to provide a loop ( one elbow and two legs ) above ground and then go under ground (to compensate the displacement of U/G pipeline) to avoide anchor underground.

Although I could not find anything (codes,standards etc.) that prevents us from doing this, I have never done this. Anyone has experience of doing it this way ? Any special problems encountered during such arrangement?

-Mandar.


This e-mail and any files transmitted with it (« Message ») are confidential and may contain privileged information.
This Message is intended solely for the addressee(s). If you have received this Message in error, please inform us promptly by reply e-mail then delete the Message and destroy any printed copy of it. Any unauthorized use, review, retransmission, dissemination, distribution, printing or copying of this Message or any part thereof is strictly prohibited. E-mails are susceptible to alteration. Neither Technip nor any of its subsidiaries and affiliates shall be liable for the Message if altered, changed or falsified

[Non-text portions of this message have been removed] Received on Thu Jul 31 10:32:00 2003

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:00 EDT