Syam:

In my experience, commissioning criteria vary. What are the design criteria for pipe supports (earthquake zones, etc.), what is the pipe transporting (flammables, corrosives, water, medium pressure steam, etc.), if inside, what is the industry (potable/food, pharmaceuticals, sewage treatment, petrochem...), what is the pressure and acceptable pressure drop, etc.

In general, the commissioning criteria are: does it meet local and industry codes and standards, does it meet the facility/owner/process needs.

                ... Bruce D. Bullough ...
                Sebesta Blomberg & Associates
                2381 Rosegate
                Roseville, MN  55113    USA
                651-634-7344 direct
                651-634-7400 FAX
                www.sebesta.com

-----Original Message-----
From: Syam Tawakkal [mailto:ikkal@yahoo.com] Sent: Friday, December 12, 2003 1:51 AM
To: Piping Design
Subject: [PipingDesign] Precommissioning and commissioning New piping system. [bcc][faked-from][bayes]

Dear All,

I would like to know how to conduct precommissioning and commissioning for a new piping system both in-side plant and out-side plant piping.

Could you tell me how to do it step by step?

I need your advice.

Best Regards

Syam Tawakkal



Do you Yahoo!?
Free Pop-Up Blocker - Get it now

[Non-text portions of this message have been removed]



Discussion List sponsor: The fluid flow calculations website - www.LMNOeng.com - LMNO Engineering, Research, and Software, Ltd.

To leave this list, send a blank email to: PipingDesign-unsubscribe@yahoogroups.com

List home: http://groups.yahoo.com/group/PipingDesign/ Main site: http://www.pipingdesign.com

Your use of Yahoo! Groups is subject to
http://docs.yahoo.com/info/terms/ Received on Fri Dec 12 09:33:00 2003

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:01 EDT