Normally,
You have to Anchor the one of the sadddle support at both launching & receiving Eqpt.If the loads are too high then first support from launcher or receiver if taken from the ground on foundation can be designed for higher loads .If that is also not possible then you can go for line stop with suitable Gap to reduce the loads to required acceptable value as per Stress Analysis Requirement(You can have a slot in to the saddle of required gap.)
Regards,
Rajesh V Balapure.

                       "Jijoy Pillai"
                       <jijoy@mis.co.ae>        To:       "PIPING DESIGN"
<PipingDesign@yahoogroups.com>
                                                cc:       (bcc: Rajesh V
Balapure/JAMNAGAR/RIL)
                       06/13/2004 11:18         Subject:  [PMX:#] [PipingDesign]
pigging station
                       AM                 Importance: Normal  Sender's OU:
Reliance |------------------|
                       Please respond to
| [ ] Confidential |
                       PipingDesign
|------------------|






Hai all,
I have to design a pigging launching and receiving station for 46" pig. There is a hydraulic launcher at the loading end and a winch and rod at receiving end to pull the pig out.
I want to see some similar designs of pigging stations to understand how the saddle is supported on the platform, how the hydraulic launcher is supported, etc...
Can any one mention some sites from where I can see this. Please someone guide me.

Thanks in advance.

Regards
Jijoy.

[Non-text portions of this message have been removed]



PipingOffice - Excel Spreadsheets for Piping Calculations http://www.pipingoffice.us/

Main site: http://www.pipingdesign.com

Yahoo! Groups Links Received on Sun Jun 13 23:19:00 2004

This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:01 EDT