To ACHE piping experts:
I would like to know what is the best arrangement for outlet piping of ACHE`s operating just above the atmospheric pressure. I had been advised to place the valve on the outlet line to horizontal position so that the vent line on it can be placed vertically with the nitrogen seal at a minimum. Any other idea for optimum performance of the said line?
[Non-text portions of this message have been removed] Received on Tue Jul 27 04:20:00 2004
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:04 EDT