I wonder how long/how many passes it takes to weld this into the line, multiple shifts?
http://www.pipingdesign.com/photos/large_valve.jpg
The photo is from a Velan catalog, it's a 36", not sure of the rating.
For this size valve, are welded ends the best way to go (as opposed to flanges)? The guts should be easily serviced through the bonnet.
Paul Received on Tue Mar 01 19:00:00 2005
This archive was generated by hypermail 2.1.8 : Mon Oct 27 2008 - 20:24:06 EDT