New and need help on manifold design

From: <hjfaigel>
Date: Mon Jul 25 2005 - 17:24:00 EDT

Have not participated in this group before and need some simple help.

Have a piping manifold that is on discharge of tank prior to peristaltic pump and need to rules of thumb for providing each stab in the manifold with the same material and not disturbing the next stab and how far away from pipe transition first stab should be. One problem seems to be that flow is towards laminar region. The stabs are taking away ~10% of the flow which is being recirculated to a tank. Received on Mon Jul 25 17:24:00 2005

This archive was generated by hypermail 2.1.8 : Tue Mar 09 2010 - 00:21:08 EST