Re: PSV Discharge Piping

From: <abdul>
Date: Wed Jul 27 2005 - 04:46:00 EDT


Dear Mr. Tushar Zope

The PSV is installed at 3 phase production separator. There is mixed fluid stream (Gas & condensate). Can i go for option 2 in this case.

regards,
A. aziz Vayani

<a href="/group/PipingDesign/post?postID=zpVJoNF-x5W5dlJWeQnrheIDkFStQanqpS31vrs9zvi0PpBTCFO0d7iGFgmwVnxglvAbUXul2dtOw792pVN0WghB">Tushar.Zope@linde-le.com</a> wrote: Dear Mr Abdul,

option 1)
The best solution is to locate the PSV above the flare header and route the discharge to flare and branch-off from the top. This will avoid the accumulatio of the liquid in the discharge. Another point is that the header is at very low pressure than the inlet. There will not be enough pr to push the liquid, the flow being instanteneous.

option 2)
Also check, what is the fluid in the inlet line. If it is purely gas which can remain a gas (without partial condesation) at the header operating pr and temp., then you can locate the PSV at the skid and route the discharge upwards. But this will be there is very rare cases in petrochemical industry. The application is not clear from your email.

With best regards.

Tushar Zope
Chief Engineer - Piping
Linde Process Technologies India Ltd,
Baroda, India 390 007
Tel.: +91 265 233 6196
Fax: +91 265 233 5213
e-mail: <a href="/group/PipingDesign/post?postID=zpVJoNF-x5W5dlJWeQnrheIDkFStQanqpS31vrs9zvi0PpBTCFO0d7iGFgmwVnxglvAbUXul2dtOw792pVN0WghB">Tushar.Zope@linde-le.com</a>

abdul aziz vayani <azizvay72@yahoo.com> Sent by: <a href="/group/PipingDesign/post?postID=xPs0DylGtm_HPAKwbL4yeMqivK0S5xJiPnOAbscfJnxKzpOBju5fKEGJjyCHJkbGLvQAEbspkM8N9UDxzdwkdw1qnYA">PipingDesign@yahoogroups.com</a> 07/26/2005 02:00 PM
Please respond to
<a href="/group/PipingDesign/post?postID=xPs0DylGtm_HPAKwbL4yeMqivK0S5xJiPnOAbscfJnxKzpOBju5fKEGJjyCHJkbGLvQAEbspkM8N9UDxzdwkdw1qnYA">PipingDesign@yahoogroups.com</a>

To
<a href="/group/PipingDesign/post?postID=xPs0DylGtm_HPAKwbL4yeMqivK0S5xJiPnOAbscfJnxKzpOBju5fKEGJjyCHJkbGLvQAEbspkM8N9UDxzdwkdw1qnYA">PipingDesign@yahoogroups.com</a> cc

Subject
[PipingDesign] PSV Discharge Piping

Hi everyone

I have to install a PSV at elevation of 2 ft from grade level on a skid. Flare header runs at an elevation of 20 ft from grade. Discharge of the PSV to be connected with flare header. Now there is chance of liquid accumulation in the vertical portion of PSV discharge pipe.Liquid accumulation is allowed in the discharge piping of PSV and BDV?

If there is not possible to avoid riser pipe then what is its remedy to overcome liquid accumulation.

Thanks in advance.

Regards,

  1. Aziz Vayani

Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around <a href="http://mail.yahoo.com">http://mail.yahoo.com</a>

[Non-text portions of this message have been removed]



PipingOffice - Excel Spreadsheets for Piping Calculations <a href="http://www.pipingoffice.us/">http://www.pipingoffice.us/</a>

Main site: <a href="http://www.pipingdesign.com">http://www.pipingdesign.com</a>

Yahoo! Groups Links

[Non-text portions of this message have been removed]



PipingOffice - Excel Spreadsheets for Piping Calculations <a href="http://www.pipingoffice.us/">http://www.pipingoffice.us/</a>

Main site: <a href="http://www.pipingdesign.com">http://www.pipingdesign.com</a>

YAHOO! GROUPS LINKS      Visit your group "PipingDesign" on the web.

     To unsubscribe from this group, send an email to:   <a href="/group/PipingDesign/post?postID=evJLrozkRX3S8BsljID89L231TOn9UY6PiLDm444L8p_TzYjKpKtUN6S890zGPd3ZtWawpOpNNxOzX5CsxzTfHIlTAJtJApmsdBWesfQXMY">PipingDesign-unsubscribe@yahoogroups.com</a>

     Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.




Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around <a href="http://mail.yahoo.com">http://mail.yahoo.com</a>

[Non-text portions of this message have been removed]
Received on Wed Jul 27 04:46:00 2005

This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:42 EST