Hello everyone,
I would like to know if it is mandatory to replace all gaskets after pressure test of piping. If we do replace the same how do we ensure proper flange tightening? I believe one of the major role of pressure testing of pipes is to ensure proper bolt tightening and leak proof flange joint.
Pankaj Mandal.
[Non-text portions of this message have been removed] Received on Tue Aug 30 23:12:00 2005
This archive was generated by hypermail 2.1.8 : Tue Mar 09 2010 - 00:21:10 EST