Hi,
I have just done the water hammer analysis for a 27km DN3000 pipeline. The valves used will be Noreva non slam check valves. Pumping Station is underground. This is water supply in the middle of a drought. Pretty sexy Uh!!!
There are block valves on top of block valves, then we have divers for the interesting problems.
Steve,
If you think cooling water is mundane have a go at raw water or sewage!!
Geoff
Design Detail and Development (a division of Blenray Pty Ltd)
Mail Address PO Box 1351 Castle Hill NSW 1765 Australia Tel Mob 0402 35 2313
Office 02 8850 2313 AH 02 8850 2324
We specialise in pipe network and waterhammer analysis, pipe stress analysis,
the design of buried pipelines and thermoplastic pipe systems.
[Non-text portions of this message have been removed] Received on Tue Sep 13 02:37:00 2005
This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:44 EST