One approach is to do a cost benefit analysis and net present value calculation of the energy, financing. maintenance and incidental operating costs over the life of the plant versus the Capex of increasing the line size. Then again the line size may be increased so that it can be supported over the span betweeen supports of larger pipes without providing intermediate supports. Yet again it may be a slurrry you are handling and then the fluid velocity has to be fast enough to keep the solids in suspension but not so fast as you wear the pipe out. You have not given enough information for us to help yo for a specific problem Neither have you said it is a general question. What is it?

Generally you piping specification will dictate minimum and maximum velocitites. If you are charged with the responsibility of writing this specification, get help as you obviously are at a loss of the criteria involved. It needs an experienced engineer to prepare such documents.

Book reference Optimum Pipe Size Selection by Nolte.

If you have the funds to invest, AFT have a marvellous program that computes the hydraulic losses uses a pump and pipe database, includes all the financial indices necesssary to do a very sophisticated piping selection. As energy costs are rising this software is a world leader and would enable any organisation to save in Opex and Capex fr a new facility. But as other memn=bers have said software alone will do nothing it needs an experienced brain to work it reliably. Garbage in means garbage out.

Go to <a href="http://www.aft.com/products/mercury/">http://www.aft.com/products/mercury/</a>

Geoff Stone
tiwarinj <tiwarinj@uniphos.com> wrote:

How do we decide the maximum velocity in a given diameter of pipe.

--
Regards
Neeraj Tiwari
MaxPro Dept.
Mob: 9879165630
Visit:<a href="http://www.uplonline.com">http://www.uplonline.com</a>



=========================================
PipingOffice - Excel Spreadsheets for Piping Calculations
<a href="http://www.pipingoffice.us/">http://www.pipingoffice.us/</a>
=========================================
Main site: <a href="http://www.pipingdesign.com">http://www.pipingdesign.com</a>




SPONSORED LINKS
Online mechanical engineering degree Mechanical engineering degree online
Process piping Mechanical engineering Mechanical engineering class Mechanical
engineering college


---------------------------------
YAHOO! GROUPS LINKS Visit your group "PipingDesign" on the web. To unsubscribe from this group, send an email to: <a href="/group/PipingDesign/post?postID=LIEfI_D9hzEj5cKa-hof4ZIiaUriiCps-1oHLe5zWSKhZG_aArqVqZBnczknl-2qL8LmUChQ5jtldaLCniuB7gintgFDvKfbEmPJ_TGbWnwg">PipingDesign-unsubscribe@yahoogroups.com</a> Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.
---------------------------------
Design Detail and Development (a division of Blenray Pty Ltd) Mail Address PO Box 1351 Castle Hill NSW 1765 Australia Tel Mob 0402 35 2313 Office 02 8850 2313 AH 02 8850 2324 We specialise in pipe network and waterhammer analysis, pipe stress analysis, the design of buried pipelines and thermoplastic pipe systems. [Non-text portions of this message have been removed]
Received on Sun Sep 18 19:02:00 2005

This archive was generated by hypermail 2.1.8 : Tue Mar 04 2008 - 11:40:38 EST