I am interested to get that file to <a href="/group/PipingDesign/post?postID=8q3CC8kIzrwmDg2g48rzrSK3Jk3sjMaEhCqdYSpDGiLeuCQ40_bq2NV-Jjv8dTtvpMyC0G8JgA">jijoy@mis.ae</a>
Pls sent it
Thanks
Jijoy
- In PipingDesign@yahoogroups.com, Paul Bowers <pbowers@p...> wrote:
>
> Sajit re-sent me the file, so if anyone is interested in looking at
it,
> let me know.
>
> Paul
>
> -------- Original Message --------
> Subject: Piping MTO Database
> Date: Mon, 14 Nov 2005 07:53:55 +0000 (GMT)
> From: Sajit Viswan <sxviswan@y...>
> To: pbowers@p...
>
> Paul,
> I wonder if you have had a look at the piping MTO database that
I
> sent you? Please do when you have the time.
> This is a system that I had done to use with the Shell MESC and
the
> newer SAP material numbering. It can enter MTO, line wise and
Isometric
> wise. Assemblies can also be entered. Which is exploded to its
> components. Report Summaries can be made line wise and Isometric
wise.
> The isometric wise MTO can be exported to excel for placing on a
manual
> CAD isometric.
> I would like you to post this on the Pipingdesign.com as a
> downloadable. The internal logics are simple enough for someone
with an
> understanding of a relational database. They can use it as a
freeware
> and develop or modify it further to put additional features.
> I am currently using the Intergraph Marian material management
> system. This one is based on the lines of the SAP system. It does
> material descriptions on a rule based method, Piping classes,
material
> requistions, construction fabrication spooling, NDE tracking
inventory
> management etc. It is also for the material take off and management
for
> other disciplines.
> This probably must be the reason that data is contained in about
1000
> or more tables. So much so that the system is so complicated that
the
> bugs and the other fixes that need to be done, Intergraph is
reluctant
> to take up. There are various silly restrictions such as the number
of
> characters that one enter for the description of an item.
> In real terms if the task of doing the MTO and the material
> requisition and others were done manually. it is a simple enough to
> understand. Not so much complicated logics as this system would
make it
> appear.
>
> Sajit Viswan
> Sr. Piping Engineer
> Technip Paris
>
Received on Sun Nov 20 04:47:00 2005