Re: minimum distance

From: <tomcruz55>
Date: Sun Dec 18 2005 - 00:42:00 EST


normally design firms the like of EPC and big companies the like of ExxonMobil has their own Design Guide and Spec that inlcuded design details for the installation of gauges/meters - i used to work with them.

What im emphasizing here are there are some design changes or mods in the piping system that require not only producing the design details of where to install a component/fitting the likes of temp gauges - for example material spec, risk evaluation, WPS, what-if, revision to all affected docs and many more may need to be consider and documented.