Re: [PipingDesign] settlement

From: <ramar>
Date: Sun Apr 01 2007 - 10:49:00 EDT

Hai ,In this case no problem as for my field experience.Normally the final spool would have been fabricated according to the field measurement.If it is not so cut the flange joints only with small length of pipe according to the gridh specification put additional pipe then weld without any force.Then do the necessary line test.(if its wrong sorry let me know the details please)

ramar
OL2K PROJECT, KUWAIT

> Hi all
> In the LAVAN LPG project we have some LPG tanks.
> After hydro test
> according to soil reports we have 1 to 2.5 cm
> settlement and time of
> this test is 3 months. So according to project
> conditions we have we
> don't have enough time. And we have to change the
> piping routes. So
> here I need to help.
> What can I do?
> We want to not buy expansion joint or loose flange
> can we use CAN
> support (negative springs) or not?
> If we have to use expansion joint do we have special
> standard about
> this one or not?
>
> Please help me.
> Thanks advanced.
> Mahdi.N.R
>
>
>
>