Re: [PipingDesign] minimum depth to be maintained for burried(underground) condensate pipeline.

From: <sviswan@technip.com>
Date: Thu Jan 17 2008 - 09:32:00 EST

A metre depth from the TOP to grade is normal. The governing consideration should be the dia of the pipe, thickness, the max wheel load at the load crossing. There is one software called CROSSI, that I had seen, that did the loading check for road crossing. Your civil people would be able to help you with this.

Sajit

Save a tree...please don't print this e-mail unless you really need to. Received on Thu Jan 17 09:32:00 2008

This archive was generated by hypermail 2.1.8 : Tue Mar 09 2010 - 00:21:23 EST