Re: [PipingDesign] minimum depth to be maintained for burried(underground) condensate pipeline.

From: <M.>
Date: Thu Jan 17 2008 - 10:26:00 EST

If the depth recommended by Sajit cannot be fullfilled or you have limitations in this regard,then the carrier pipe may be reinforced by installing sleeves, such as repair sleeves. Note; that it is recommended to conduct calculations. Crossings shall be designed for the highest total loading expected. API RP1102 is a good document to refer to

Khaled Mahmoud
--- sviswan@technip.com wrote:

>
> A metre depth from the TOP to grade is normal. The
> governing consideration
> should be the dia of the pipe, thickness, the max
> wheel load at the load
> crossing. There is one software called CROSSI, that
> I had seen, that did
> the loading check for road crossing. Your civil
> people would be able to
> help you with this.
>
> Sajit
>
>