Check Valve in Drain Pocket

From: <phenol19>
Date: Thu Jul 31 2008 - 09:50:00 EDT

Hello.

In piping layout check valve has been installed in drain pocket and at the down stream drain connection is provided after check valve.

Now i want to ask should we provide drain point at both upstream and down stream of check valve. or only drain connection at downstream is sufficient ?

i want to know about best pratice in this case.

Down Stram  ----------                 ---------- Up Stram
                      l                l
                      l                l
                      l                l
                      ---o---z---o------  ( Z = Check Valve)
                         l       l        (o = drain point)

- -
(Drain Valve)-ox -ox (Drain Valve)
- -